Theory of Constraints Simulation

Visualize bottlenecks and optimize production flow

Time: 0s | System Throughput: 1.50 units/min
Station A
Throughput:5.0 u/min
Current Load:0.0/10
Queue:0.0
Station B
Throughput:2.7 u/min
Current Load:0.0/8
Queue:0.0
Station C
Throughput:8.0 u/min
Current Load:0.0/12
Queue:0.0
Station DBottleneck
Throughput:1.5 u/min
Current Load:0.0/6
Queue:0.0
Station E
Throughput:15.0 u/min
Current Load:0.0/15
Queue:0.0
Production Flow
A
B
C
D
E
Built with v0